Key Test Objectives
1. RCS Control System
- Validate control accuracy on flat air bearing
- Verify response time and stability
- Test multiple control scenarios
2. Sensor & Data Systems
- IMU sensor calibration and verification
- Data collection reliability
- Real-time processing performance
3. Recovery Systems
- Deployment mechanism reliability
- Shock load management
- Recovery system integration
4. Emergency Procedures
- Sensor failure handling
- Communication loss protocols
- Partial system failure management
Key Test Objectives
- Pressure system safety protocols
- High-pressure gas handling procedures
- Electronic system safety measures
- Testing area safety requirements

댓글 남기기