HSR-1’s Materials

Aluminum

1. Lightweight

2. workability

3. Cost Effieciency

CFRP

1. High Strength-to-Weight Ratio

2. Fatigue Resistance

3. Thermal Stability

4. Design Flexibility

3D printed

1. Fast Production Speed

2. Cost Efficiency

3. Design Freedom

4. Lightweight Structures

Click the title and see more information

  • Propulsion

    Propulsion

    We selected this motor to complete our mission and reach an altitude of over 10,000fts. Initially, I planned to use an M1845NT Motor, but after simulating it in OpenRocket with the expected weight, it didn’t reach the target altitude. Therefore, I decided to use this motor with a higher average thrust. Area specific Propulsion Type…

  • Simulation / Analysis

    Simulation / Analysis

    1. Rocket dynamics_1 by Controla – (Guidance, Navigation and Control LAB) 2. TVC Rocket dynamics_2 by Controla – (Guidance, Navigation and Control LAB) 3. Matlab simulation Plot – TVC Rocket (RK4) 4. 2025 IREC-HANul Core idea diagram 5. OpenRocket simulation results 6. Rocket Simulation Tutorial

  • Payload

    Payload

    The payload in this project adheres to the 3U CubeSAT standard and includes three advanced IMU sensors (10-DoF MEMS IMU sensor [SEN0140], 9DOF IMU AHRS sensor module, and 9-axis IMU LSM9DS1 module) to measure vibration, acceleration, and angular velocity, aiming to validate sensor durability and vibration resistance under launch conditions, comparing data over altitude and…

  • Electronics

    Electronics

    1. COTS Flight Computers Primary Recovery System: Tracking System Data Collection 2. SRAD Flight Computer Main Processing Units Sensor Array 3. RCS (Reaction Control System) Components Solenoid Valve System Control System 4. Communication Systems Telemetry System Real-time Video Processing 5. Data Storage and Management Storage Solutions Data Management 6. Power Management Power Distribution 7. Ground…

  • Recovery

    Recovery

    In our recovery system, the drogue parachute is deployed at apogee. The secondary charge is activated 1 second after apogee. The main parachute is deployed at an altitude of 1,000 feet, and its secondary charge is also triggered 1 second after reaching that altitude. The parachute diameters are 2.3 feet for the drogue and 7.22…

  • TEST

    TEST

    Key Test Objectives 1. RCS Control System 2. Sensor & Data Systems 3. Recovery Systems 4. Emergency Procedures Key Test Objectives

  • Structure

    Structure

    Airframe Diameter (mm) Number of fins 136.0 8